Human Excellence is the St Aloysius’ College Strategic Plan for 2021-2025. In this plan, we commit ourselves to a deepening of our mission over the coming half decade as we seek to continue to form young men for others.

One of the priorities within Human Excellence is the renewal of our physical site to make it mission-fit for a 21st Century Jesuit school. Our Master Plan, Plan Magis, has a very deliberate focus upon our classrooms – the learning environments of tomorrow. We seek to ensure that these spaces are conducive to the academic needs of our current and future students.

The classrooms in the Senior School are in obvious need of renewal. We are seeking learning spaces that are more adaptive, capable of supporting collaborative learning and in which shared practice is prioritised. These are essential for future excellence.

We were delighted to complete Phase 1 of Plan Magis on our Wyalla Campus in 2020 and in doing so have provided our Senior students an academic environment that aligns to their pathways to university study. In 2021, we completed Phase 2.1 on the Upper Pitt Street Campus. These works included the new Andrea Pozzo SJ Centre for Visual Arts.

Phases 2.2 and 2.3 of Plan Magis will commence in December 2022 and be completed by the end of 2024. These are the most ambitious works in two generations at St Aloysius’ and involve the construction of a brand-new building across the existing Quadrangle. The designs in this booklet provide a visual representation of our new academic facilities.

This new building will be filled with new classrooms, a new student commons and a new Senior School Kircher Library. The boys’ play area will be raised to a new rooftop terrace overlooking the most beautiful natural harbour in the world.

Thank you to all members of the Aloysian Family for your ongoing support of the College and its mission. I look forward to sharing our plans and achievements with you in the coming months.

MT_Signature-02.jpg

Mark Tannock l Principal

Works Timeline

Junior School

C304-Sections - L2 Addition Option 2.png

PHASE 1

The extension of two existing level 1 classrooms, as well as internal

upgrades of teaching and learning spaces in the Wyalla building.

2019-2020

2524 - Dalton Hall and Wyalla Combine File - Rearrange -V2 copy 6.png

Upper Pitt Street

PHASE 2

The site of the most significant work. A new, engaging teaching and learning precinct spanning the eastern Upper Pitt Street
wing through to the library.

Completed in February 2022.

Work on these is due to commence at the end of 2022.

2022

2022-24

2670-Upper Pitt Street UPitt St Elevation.png

COMPLETE

COMPLETE

PHASE 3

IN PLANNING

A new subterranean sports facility and associated undercroft area on the corner of Bligh and Crescent Place.

IN PROGRESS

IN PROGRESS

Phase 2.2

20220315-004-StAloysiusCollege_cropped.png

Phase 1

COMPLETE

Wyalla &
Dalton Hall

Wyalla

Wyalla & Dalton Hall

Wyalla has served the College since 1917 and has now been refurbished and transformed into a dedicated Senior School Campus.

Officially opened in February 2020, Wyalla is an excellent example of our plans which prioritise the classrooms for our boys because it is in these that we can have the greatest impact on their engagement, learning and achievement.

Our designs ensure outstanding learning spaces that are visible, adaptive and collaborative.

20220315-032-StAloysiusCollege.jpg
20220315-030-StAloysiusCollege.jpg
Andrea Pozzo_Main.png

Phase 2.1

Andrea Pozzo SJ Centre for Visual Arts

COMPLETE

Andrea Pozzo SJ Centre for Visual Arts

Andrea Pozzo SJ Centre for Visual Arts

Officially opened in February 2022, the new Pozzo Centre is part of Phase II: Stage 1 of Plan Magis.

Its design is consistent with the first Phase of Plan Magis in Wyalla, prioritising collaboration, flexibility and visibility.

0001-StAloysius-ArtsCentre.jpg
20220315-089-StAloysiusCollege.jpg

Phase 2.2

IN PROGRESS

Senior School
Kircher Library

Senior School Kircher Library

Senior School
Kircher Library

Phases 2.2 and 2.3 provide for much greater connection for our community on the Upper Pitt Street Campus and include a new Student Commons and Senior School Library. This Library will provide an excellent environment for investigation and enquiry in our academically oriented Jesuit school.

2869 St Aloysius - L0 Library 4.jpg
2869 St Aloysius - L0 Library 6.jpg

IN PROGRESS

Phase 2.2

Rooftop Terrace

Rooftop Terrace

Rooftop Terrace

The boys’ play area will be elevated onto a new roof terrace overlooking the most beautiful natural harbour in the world. The terrace will increase the available recreation space by a third and also provide a superb new facility for the Aloysian Family to come together regularly.

Screen Shot 2021-07-31 at 2.06_edited.jpg
Screen Shot 2021-07-31 at 2.07.22 pm.png
2869 St Aloysius - L3 MPH1.jpg

IN PROGRESS

Phase 2.3

New Performance and Teaching Spaces

2869 St Aloysius - L1-2 T&L 8.jpg
2869 St Aloysius L1-2 Classrooms (2).jpg

How the College has evolved

We are the beneficiaries of the vision and generosity of previous generations of Aloysian families. As stewards of the College’s mission we will bequeath to future boys a school that is best suited to their needs as learners.

Mark Tannock l Principal